LP2: Task Types and Configuring an Activity Template

Introduction

When building an activity there are different options to consider such as predecessors (which determine the order of tasks), assignee (who will receive the task), duration (how long it should take a user to complete that task), and task type.

The following table explains every task available in e-flow.

 

Task Types

Work Item Icon Description
Basic Task task_ticky.png

These are simple non-proofing tasks that just require completing, with the option to write a note/comment on the task.

Asset Upload task_upload.png

These require that either a new asset (file) is uploaded or an existing one is chosen from an asset library.

 

Approval task_approval.png

This icon indicates that the asset is under review. There will be a different row for each approval task in the current cycle, reviewed by at least one user or multiple users.

An 'Approved' verdict progresses the activity.

A 'Not Approved' verdict triggers a Fail Condition which loops back to a specific point in the activity until an 'Approved' verdict is reached.

Form Data Input task_form.png

This task requires you to complete a form: enter details in fields and select contacts to be assigned future workflow tasks.

Milestone task_milestone.png

These tasks are completed automatically once reached and can trigger notifications to relevant stakeholders. Stakeholders do not need to be users to receive a notification. Milestones can also be used to route a decision in an activity such as a 'yes' or 'no' decision route.

Link Activity / Brancher task_brancher.png

This indicates that another linked activity has been started.

If the activity has been configured so, it will not progress beyond the brancher until the child activity/activities have been completed.

Stage task_stage.png

A stage is a group of tasks/work items. Stages break up your process into manageable sections and may assist in reducing complexity. Bypassing a stage will skip all grouped tasks to resume at the next task following the stage; bypass must be enabled in the activity template.

Adhoc Approval task_adhoc.png

This approval allows the task assignee to build the approval workflow by grouping approvers into 'steps': adding duration and adding further assets in any linked activity to approve in a batch if required.

Group Activity Brief task_group_activity_brief.png

Complete forms in groups, allowing you to add data to all forms simultaneously. When created, these forms appear in the 'Briefs' tab of the Activity.

Group Commercial Form task_group_commercial_form.png

Complete forms in groups - allowing you to add data to all forms simultaneously. When created, these forms appear in the Commercials tab of the Activity.

Content Collation task_content_collation.png This is for creating things such as pack copy and works with the content hub and categories.

Upload Visual Brief

task_upload_visual_brief.png

Similar to a normal upload task except you can only link this to 'Visual Brief' assets. It connects to a visual brief review task (see below).

Visual Brief Review

task_visual_brief_review.png

This follows the Upload Visual Brief task and works like a normal approval task except that a verdict is not given for a visual brief asset.

 

Predecessors

If there is more than one task within the activity then the activity template designer can set a predecessor for the task(s). This allows the template designer to create the correct order of the tasks for the specific required workflow. You can have one task that has multiple predecessors: this would happen if you had multiple tasks running at the same time.

 

Assignee

Tasks can be assigned to a user or to a role.


If assigned to a role, each user with that role will see the request to complete the task in their task list and can choose to take the task. If the task is taken, it will disappear from all other users' task list.

 

Duration

Each Task is given a duration, priority and cost if required. If a task isn't completed in the duration that is assigned, the task will appear as late and show as red.

 

 

See also:

LP3: Activity Priority

LP3: RACI Assignments

LP5: Role Security Levels

LP5: Understanding and Working With User Roles

 

Was this article helpful?
0 out of 1 found this helpful

Comments

0 comments

Please sign in to leave a comment.